Reorder point calculator
Free · No signup · Guide approved 18 November 2026 by Nirav Italiya, founder · How we check guides
How do I calculate the reorder point?
Reorder point = average daily sales × lead time in days + safety stock. When stock falls to that level, place a new order. Enter your average daily sales and supplier lead time, then work out safety stock from your highest sales and longest lead time, or from a service level, and the calculator gives the reorder point.
Reorder point
420 units
Reorder when stock falls to this level: 200 for lead-time sales + 220 safety stock
Stock at the moment you reorder
- Sales during lead time 200 units
- Safety stock 220 units
Reorder point = average daily sales × lead time + safety stock. Safety stock = (highest daily sales × longest lead time) − (average daily sales × average lead time).
Fewer returns, better margin
Show buyers the real fit and colour
Returns and RTO eat profit. On-model photos that match what buyers receive help them choose right the first time.
- First 2K photo free, no card
- Ready in about 3 minutes
- Full commercial rights


How to use it
- Enter average daily sales and average lead time.
- Choose a safety stock method.
- Enter your highest daily sales and longest lead time, or the standard deviation of daily sales and a service level.
- Set a stock alert at the reorder point.
Who this is for
This calculator is for sellers who hold stock and keep running out, or keep ordering too early: a seller with a supplier overseas and a three-week wait, a brand stocking a marketplace fulfilment centre, or a shop setting low-stock alerts in its inventory system for the first time.
It gives one number per product: the stock level at which you place the next order. That number has two parts, the units you will sell while you wait for delivery, and a safety buffer. The calculator lets you set the buffer by a simple max-versus-average rule or by a target service level.
How the calculator gets the number
Reorder point = average daily sales × average lead time + safety stock, rounded up to a whole unit. With the max-versus-average method, safety stock = highest daily sales × longest lead time − average daily sales × average lead time. With the service-level method, it is Z × standard deviation of daily sales × √lead time, and you choose 90%, 95%, 97.5%, 98% or 99%. The bar under the result shows how much of the reorder point is lead-time sales and how much is buffer.
Worked example: the two methods side by side
A hypothetical product sells 12 a day on average, 18 on its busiest normal day, with a 21-day average lead time and a 28-day longest. Lead-time sales are 12 × 21 = 252. The max-versus-average method gives safety stock of 18 × 28 − 252 = 252 and a reorder point of 504, which is 42 days of average sales.
If daily sales have a standard deviation of 4, the service-level method gives a far smaller buffer, because it does not assume the worst day happens every day of the worst delivery.
| Service level | Z | Safety stock | Reorder point |
|---|---|---|---|
| 90% | 1.28 | 24 | 276 |
| 95% | 1.65 | 31 | 283 |
| 98% | 2.05 | 38 | 290 |
| 99% | 2.33 | 43 | 295 |
| Max vs average | — | 252 | 504 |
Measuring lead time properly
- Count from the day you place the order, not the day the supplier ships.
- Include production, quality checks, transit, customs clearance and the time to receive and shelve stock.
- If stock goes to a marketplace warehouse, add the inbound transit and the time it takes to be checked in and made available to sell.
- Use your last several orders. The longest one goes in the “longest lead time” field; do not just guess.
- Allow for factory and courier closures around major holidays in the supplier’s country, which can add a week or more.
Compare it with stock position, not stock on the shelf
When the lead time is longer than the gap between your orders, an earlier order is still on its way when you reach the reorder point. Compare the reorder point with on-hand stock + stock already ordered − orders sold but not yet shipped.
With the 95% reorder point of 283 above: if you have 200 on the shelf and 150 in transit, your position is 350 and you do not reorder yet. Comparing only the 200 on the shelf would trigger a second order and leave you overstocked when both arrive.
Worked example
Selling 20 units a day with a 10-day lead time means 200 units will sell while you wait. If your busiest day is 30 units and the longest delivery 14 days, safety stock is 30 × 14 − 20 × 10 = 220, so the reorder point is 420 units.
Choosing a method
The max-versus-average method is simple and cautious. The service-level method (Z × standard deviation × √lead time) is better when you have reliable sales data and want a specific in-stock probability such as 95%.
Set alerts
Most inventory tools and marketplaces let you set a low-stock alert. Put the reorder point there, and review it when sales or lead times change, for example before festivals or holiday peaks.
Common mistakes
- Calculating average daily sales over a period when you were out of stock. Zero-sale days pull the average down and set the next reorder point too low.
- Putting a one-off promotion or viral day into “highest daily sales”, which inflates the buffer for the whole year.
- Entering the average lead time in the “longest lead time” field, which makes the basic buffer far too small.
- Setting a reorder point once and leaving it after sales have doubled or the supplier has changed.
- Forgetting that a reorder point says when to order, not how much. Pair it with an order quantity such as the EOQ.
What this tool can’t do
- The service-level method covers swings in demand only. It treats lead time as fixed, so if deliveries vary a lot, the max-versus-average method or a larger service level is safer.
- It assumes daily sales are fairly steady and roughly bell-shaped. For slow sellers that sell 0, 1 or 2 a day, the statistical buffer is less reliable.
- If you only check stock once a week, add those 7 days to the lead time, because you may pass the reorder point just after a check.
How this guide was made: drafted with AI assistance from the tool’s own calculations and behaviour, then checked against our editorial policy and approved by the founder before publishing.
Questions
- What is the reorder point formula?
- ROP = average daily demand × lead time + safety stock.
- What is lead time?
- The days between placing an order and the stock being ready to sell, including production, shipping and receiving.
- What if I have no safety stock?
- Then the reorder point is just lead-time demand, and any delay or sales spike causes a stockout.
- How often should I recalculate it?
- Whenever sales speed or supplier lead time changes, and before seasonal peaks.
- What is the difference between reorder point and EOQ?
- The reorder point tells you when to order; EOQ tells you how much.
- What is a reorder point example?
- Selling 15 units a day with a 7-day lead time and 40 units of safety stock gives a reorder point of 15 × 7 + 40 = 145 units.
- How do I calculate lead time demand?
- Multiply average daily sales by the lead time in days.
- Should I use the same reorder point all year?
- No. Recalculate before festivals, sales events and seasons, when daily sales and lead times change.
Add this calculator to your website
Run a blog, seller community or agency site? Paste this code where you want the Reorder point calculator to appear. It is free, has no ads, and works on WordPress, Shopify, Wix, Blogger and plain HTML.
?theme=dark to the address for a dark version.